Wednesday, June 15, 2011

30 Hand pumps drilling and installation project

DWCC has completed the project of 30 Hand water pumps drilling and installation project in 2008 in Refugee town of Ghazni city. The project was awarded by respected Ghazni Polish PRT and DWCC completed this project with high standard.



The workers of DWCC are drilling the well in a location in Ghazni Refugee Town (2008)


The workers of DWCC are drilling a well in a location in Ghazni Refugee Town (2008)

Picture of Pipes which have been used by DWCC in this project for Hand water pumps (2008)


The workers of DWCC are installing a Hand water pump in a location in Ghazni Refugee Town (2008)

People are using the Hand water pumps after drilling and installation by DWCC (2008)


Ghazni Polish PRT Team is cheking one of the well in a location in Ghazni Refugee Town (2008)


The Ghazni Polish PRT Engineer (Mr. Lech Martinka) is Checking a water hand pump in Ghazni Refugee Town (2008)

A Team Member of Ghazni Polish PRT is checking a well which has been drilled and installed by DWCC during their site visit to Ghazni Refugee Town (2008)

 The Ghazni Polish PRT Team is discussing the project progress during their site visit to Ghazni Refugee Town (2008) 