Sunday, August 14, 2011

Renovation of 6 Kilometers of Mirza Gul Mohammad Canal Project in Qalat City of Zabul Province 2011

The Mirza Gul Mohammad 6 Kilometers Canal Renovation Project was awarded by respected Zabul PRT in 2010 and DWCC Compelted this project with high quality in 2011 and received a project completion certificate as well.

DWCC Machinery is excavating the foundation for Flood Protection wall in Mirza Gul Mohammad Canal 2010


DWCC Workers are working on Flood Protection Wall construction in Mirza Gul Mohammad Canal 2010



Work on Flood Protection Wall construction in Mirza Gul Mohammad Canal is in progress 2010


The Completed View of Flood Protection Wall construction in Mirza Gul Mohammad Canal 2010

The Completed View of Flood Protection Wall construction in Mirza Gul Mohammad Canal 2010

The Completed View of Water Entrance to Mirza Gul Mohammad Canal 2010

The Construction of Gabbion Wall is in progress in Mirza Gul Mohammad Canal 2011


The Completed view of Gabbion Wall in Mirza Gul Mohammad Canal 2011


Mirza Gul Mohmmad Canal Opening Ceremony (Zabul Provincial Governor Mr. Mohammad Ashraf "Nasiri" is cutting the ribbin) 2011

Monday, June 20, 2011

Construction of Road in Bazaar of Moqur District of Ghazni Province 2009

DWCC completed the Construciton of 680 Cobble Stone Road Project in Bazaar of Moqur District of Ghazni Province. The project was awarded by Respected Ghazni Polish PRT. DWCC completed this project in 2009.

Machinery of DWCC is Granding the Kabul Kandahar road shoulder


Machinery of DWCC is Granding the Kabul Kandahar road shoulder

DWCC workers are paving the cobble stone on Kabul Kandahar Road Shoulders in Moqur District Bazaar in Ghazni Province.

The Completed View of Kabul Kandahar Highway 1 Shoulder in Moqur District Bazaar of Ghazni Province the project has been implemented by DWCC.

The Completed View of Kabul Kandahar Highway 1 Shoulder in Moqur District Bazaar of Ghazni Province the project has been implemented by DWCC.


The Graded View of District Center Road from Kabul-Kandahar Highway 1 to District Center (Grading has been done by DWCC).

DWCC Workers are Paving the Cobble Stone on Kabul-Kandahar Highway 1 to District Center Road


 Completed view of Project, The Project has been completed with a high quality in 2009 by DWCC with Financial Support of Respected Ghazni Polish PRT

Wednesday, June 15, 2011

DWCC License


DWCC Business License Front Side

DWCC Business License Back Side


Construction of Road in Janda bazaar in Gelan District of Ghazni Province 2009


DWCC completed the Construciton of 369 Cobble Stone Road Project in Janda Bazaar in Gelan District of Ghazni Province. The project was awarded by Respected Ghazni Polish PRT. DWCC completed this project in 2009.


The Workers of DWCC are working on Culverts in Janda Bazaar in Gelan district of Ghazni Province (2008)
 
 The Workers of DWCC completed the pavement of Cobble stone in Janda Bazaar
 (Kabul-Kandahar Road Shoulders)

The Workers of DWCC completed the pavement of Cobble stone in Janda Bazaar
 (Kabul-Kandahar Road Shoulders)

The Completed View of Janda Bazaar Cobble Stone Road Project in Gelan district of Ghazni Province
(2008)

30 Hand pumps drilling and installation project

DWCC has completed the project of 30 Hand water pumps drilling and installation project in 2008 in Refugee town of Ghazni city. The project was awarded by respected Ghazni Polish PRT and DWCC completed this project with high standard.



The workers of DWCC are drilling the well in a location in Ghazni Refugee Town (2008)


The workers of DWCC are drilling a well in a location in Ghazni Refugee Town (2008)

Picture of Pipes which have been used by DWCC in this project for Hand water pumps (2008)


The workers of DWCC are installing a Hand water pump in a location in Ghazni Refugee Town (2008)

People are using the Hand water pumps after drilling and installation by DWCC (2008)


Ghazni Polish PRT Team is cheking one of the well in a location in Ghazni Refugee Town (2008)


The Ghazni Polish PRT Engineer (Mr. Lech Martinka) is Checking a water hand pump in Ghazni Refugee Town (2008)

A Team Member of Ghazni Polish PRT is checking a well which has been drilled and installed by DWCC during their site visit to Ghazni Refugee Town (2008)

 The Ghazni Polish PRT Team is discussing the project progress during their site visit to Ghazni Refugee Town (2008)